预约免费课程
预约免费试听课程
预约报名 领取礼包

没错!从香港去澳门只需30分钟

中等

难度

说明文

时文类型

旅游与交通

时文话题

初中三年级

适合年级

关注公众号、微信做时文

时文摘要

本文主要介绍了港珠澳大桥的基本情况。

分享:
时文录音
闯关习题描述一下时文录音

The assembly of the first curved section of the underwater tunnel for the Hong Kong- Zhuhai- Macau Bridge was successfully completed on Oct. 8, 2016. Hailed by The Guardian as “one of the seven modern wonders in the world”, it is the world’s longest bridge currently under construction.
Starting from Lantau Island in Hong Kong, the Y-shaped bridge will boast a total length of about 55 kilometers, including a 6.7-kilometer underwater tunnel and a 23-kilometer bridge over the sea. Man-made islands will be built at both ends of the tunnel to allow for the passage of large ships.
The bridge will serve as an important channel linking Hong Kong, Macau, Zhuhai and the western part of the Pearl River Delta, one of the most economically developed areas in the Chinese mainland.
The construction of the bridge started in 2009. Its total cost will come to some 10 billion RMB ($1.5 billion). It is expected to be completed by the end of 2017. Once in operation, the travel time between Hong Kong and Zhuhai or Macau will be reduced from three and a half hours to just 30 minutes.

本时文内容由奇速英语国际教育研究院原创编写,未经书面授权,禁止复制和任何商业用途,版权所有,侵权必究!(投稿及合作联系:028-84400718  QQ:757722345)
微信扫码,手机上做阅读
最新评论
点击显示
本文翻译请先完成本篇阅读

奇速优课平台

轻松创业线上机构

免费了解

奇速英语 · 英语夏令营

7天单词特训

免费了解

奇速英语同步培优

单元知识点讲解+单元过关手册+常考易错题

学习
更多优质学习内容
奇速优课课程咨询
请填写信息
立即提交

四川奇速教育科技有限公司

网站备案号:蜀ICP备14006206号-4
Copyright @ 2018
All Rights Reserved.

帮助中心 百度统计 站内地图 新闻中心

联系我们

黄老师:17760376675  
蒋老师:13980503458  
袁老师:13982203753  
朱老师:18011421646  
  13980503458      admin@qisuen.cn

奇速优课

微信扫码